H2S Shelters

30 Men Central Control Room (CCR)

The complete package of H2S Shelter in Place (SIP) and HVAC equipment will be delivered and installed in a modular building at the Gas Plant. It will be used as the CCR with engineer’s stations during normal operation and as a safety place for plant personnel during emergency mode operation for up to 30 people for 2 hours.

This SIP consists of 181*0.05m3 high-pressure cylinders and the system pressure is 30Mpa. A system compressor will fill the high-pressure cylinders when the quality of the external air is normal.